Most OEM budgets are built once a year and assume material costs will behave. In a market where prices move several times between January and December, that assumption is expensive. A budget built on one price per foot can look fine in the first quarter and be well off by the fourth.
You can’t control steel pricing, but you can control how exposed your budget is to it. The OEMs that handle this best plan for price movement instead of reacting to it.
Why Prices Keep Moving
The current pressure isn’t coming from the usual place. Steel prices are holding near historic highs even though demand in many traditional construction sectors has softened, with data center and infrastructure projects among the forces keeping them there. Supply doesn’t adjust quickly either. One electrical distributor’s 2026 report says some manufacturers of related materials may need 18 to 24 months to add production capacity.
For a manufacturer buying steel framing, the practical takeaway is that this is a market with limited slack. Prices can step up, and they don’t reliably step back down on the timeline a budget cycle requires.
Where the Exposure Actually Sits
On a $500,000 annual channel spend, a 10 percent move in material cost is $50,000. That figure is hypothetical, but the math scales to any program.
Price risk shows up in three places. It shows up at the quote, because a price is only good for a defined window. It shows up at the order, because material bought later may be priced differently than material bought now. And it shows up at the release, because a long production schedule means you’re buying across several price points. Each is manageable, but only if you know which one your program is exposed to.
Five Ways to Plan Material Costs in a Moving Market
Budget a range, not a single number. Set a base case and a realistic high case for material cost, and decide in advance what you’ll do if the high case arrives. A range turns a surprise into a pre-planned decision.
Know your quote window. Quotes carry a validity period. If your approval process takes longer than that period, the quote you approved is not the price you’ll pay. Match your internal timeline to the quote window, or ask for terms that fit your process.
Align purchasing with your production schedule. A blanket purchase order with scheduled releases lets USC procure against your forecast, which can help stabilize pricing and make sure material is available when your line needs it. Exact terms depend on the agreement, so these are worth defining up front.
Reduce how much material you need. This is the most overlooked hedge. USC uses a proprietary cut calculator that nests your required lengths against stock to maximize yield and minimize waste. On larger runs, using less material to complete the same bill of materials lowers cost whatever the price per foot is. Suppose better nesting trims material need by 5 percent. In the example above, that would offset half of a 10 percent price increase. The figure is for illustration only, but the principle holds. Standardizing cut lengths across your product line, as we covered in our article on assembly complexity, makes that kind of efficiency easier to capture.
Plan around availability, not just price. A lower quote on material that arrives late costs more than a higher quote on material that arrives on time. Bring your bill of materials to USC early. Not every catalog item is a stock item, and a part that looks routine can have a longer lead time than expected. Catching that at the BOM stage is a simple conversation. Catching it when your line is scheduled to run is not.
What Not to Do
Buying a large quantity ahead of need is not a free hedge. It ties up working capital, takes up space, and creates risk if the design changes. Buy ahead against real, scheduled demand, not as a reaction to a price headline.
Chasing the lowest price per foot from a source that can’t document its material, or that can’t commit to delivery, simply moves the cost somewhere less visible. As we covered in our total cost of ownership article, the purchase price is only part of what material actually costs to run through your operation.
Making Your Own Pricing More Resilient
It also helps to look at how your own customer pricing handles material cost movement. Some OEMs build quote validity limits or material cost adjustment language into their customer agreements so that a major cost swing doesn’t fall entirely on their margin. How you structure that is a decision for your finance team and legal counsel, and what’s appropriate depends on your contracts and your market. But if your material cost is volatile and your selling price is fixed for a year, it’s worth asking whether that mismatch is deliberate.
Where USC Fits In
We won’t always be the lowest price per foot, and we’re upfront about that. What we focus on is helping OEMs hold down total material cost and keep the line running.
USC’s Stock to System approach combines inventory depth, sourcing, cut-to-length processing, kitting, and delivery planning into a pathway from your requirement to fulfillment. In practice that means a conversation about your forecast, a BOM review that flags availability risk early, nesting that reduces the material you buy, and a release schedule matched to your production plan.